top of page
  • Writer's pictureBlackmoor Knight

Completion of Great Marlborough St. Central London

We are pleased to report on the completion of a partial refurbishment and upgrade of the Reception and Ground to 4th floor at Great Marlborough Street London building in December 2021.

Our client, an international asset/investment company wanted to bring the building and lettable space up to current standards while minimising costs.


With our own assistive architects and designers, we came up with a fabulous lettable office space.


The main works consisted of;

  • Re-design and major works to the reception

  • New VRV systems

  • New LED lighting

  • New door entry and floor by floor entry system.

  • Refurbished flooring

  • Upgraded kitchen/tea stations and toilets.

  • Re-establishing lettable office space to old Comms room.

  • External repairs to windows and masonry and complete external repainting. Which required complete external scaffolding and licences and approvals.

  • Internal new Data and electrical wiring and upgrading of electrical distribution boards and equipment.

  • Complete repainting and decoration to all internal areas.

Take a look at the finished project – we are really proud of the results.





bottom of page